Kitchen gets dropped in
The tiled counter tops are done, the redwood trim is on as good as it's going to get, the pieces are in place, and there's water and drain lines in. (not connnected to anything on the outside, but in)
Here's the sink in the afternoon light:
The fridge is also in place, waiting for it's propane hook up:
and the whole kitchen:
No comments:
Post a Comment