A bit of progress, drains
The wall is crawling up. it's not hard work, but it's hard to just do the same thing all day... we can see the end of this part of the project though. here is the 'SW corner' of the house with the kitchen sink drain popping out. The inside end of this pipe will be well below the floor line, and possibly below the outside patio line as well. You can sort of make out a stick in the middle of this picture, right above the drainpipe. that's our rough floor marker... well, about two inches down from the top of that stick is where the floor will be. We want to have the stone wall go above that line.
Here's the shower drain, right below that floor mat on the wall. This too, will be well below the floor level. You also get a good shot of the solar trailer here... the trailer is nearest the NW corner of the house.