set backs and progress

Turns out the circuit box that was on the cabin only holds SIX circuits.  I need 8.  I guess I have to buy a new box.  darn. 


Managed to get some rigid foam in between the 2x4 studs of the loft, between the crawl space and the main room.  I feel that's enough insulation.  Now to get the drywall up over this stuff. 