Saturday, March 02, 2019

set backs and progress

Turns out the circuit box that was on the cabin only holds SIX circuits.  I need 8.  I guess I have to buy a new box.  darn. 


Managed to get some rigid foam in between the 2x4 studs of the loft, between the crawl space and the main room.  I feel that's enough insulation.  Now to get the drywall up over this stuff. 

No comments:

Design Mistakes in my cob house

So, I have long meant to create a list of mistakes I made when designing the finishings on our house.  Now that we've lived in it for a ...