Manifold Central
Well, all the water lines are in, and the drain lines are ready to be hooked up (but I want to wait, as they will run through the west patio, where I do a lot of work) and I need to figure out how I'm going to cover this up and protect it. Here you can see the white cold water line, the gray and green and yellow gas line(s) and the black and red hot water lines.
The tool box is holding down a PEX line that wants to bend up, and is in there for scale. It's also sitting about where I want to have the clothes washing machine when all this is done (thus the water riser there with the shut off). Now, one issue is how to deal with the slope from the wall to the 2x4 on the ground. Remember also that the patio (to the right in the above photo) will probably come up 8" to 10" with flagstones, etc. I should probably build a deck that will allow access to those pipes on the ground...
Maybe a railroad tie along the front that the deck can sit on and the flagstones can come up against.
No comments:
Post a Comment