Wednesday, September 20, 2006

More outside bathroom work:


Once I got the exterior walls up on the bathroom (redwood planks meeting together at the sides, with 'batten' stripes nailed between them to cover the seams) Melissa got to work sealing the redwood with deck sealer. Here she is getting woozy from the fumes:





















Here's the front of the outhouse, with the traditional moon carved in the front:

No comments:

Design Mistakes in my cob house

So, I have long meant to create a list of mistakes I made when designing the finishings on our house.  Now that we've lived in it for a ...